Skip to Content
HomeElectricalCompetition Resources

Competition Resources

This section provides essential resources for effective competition preparation, pit organization, and match-day operations to ensure optimal electrical system performance under pressure.

🎯 Competition Readiness Overview

🧰 Pit Organization System

Essential Tool Categories

Toolbox Organization Strategy

Physical Organization Layout

Primary Tool Chest (Large Items)

Top Drawer: Daily Use Tools - Digital multimeter with leads - Battery tester and load - Ethernet cable tester - Basic hand tools (screwdrivers, hex keys) Middle Drawer: Electrical Supplies - Organized connector bins by type - Wire spools by gauge and color - Fuses sorted by amperage - Electrical tape and heat shrink Bottom Drawer: Hardware & Fasteners - Metric and Imperial fasteners - Cable ties and mounting hardware - Spare mechanical components - Emergency repair materials

Secondary Storage (Specialized Items)

Case 1: Advanced Diagnostics - Oscilloscope and probes - CAN bus analyzer - Network analysis tools - Specialized test equipment Case 2: Repair Supplies - Soldering station and supplies - Heat gun and shrink tubing - Wire repair materials - Connector replacement parts Case 3: Safety & Emergency - First aid supplies - Personal protective equipment - Emergency tools and lights - Communication devices

Accessibility Principles

  • 5-Second Rule: Most used items accessible within 5 seconds
  • One-Hand Operation: Tool access with single hand
  • Clear Labeling: Everything labeled with description and location
  • Logical Grouping: Related items stored together
  • Emergency Access: Critical items marked and easily located

📦 Spare Parts Inventory

Critical Spare Parts (Must Have)

Power System Spare Parts

Primary Power Components

Batteries: - 1x Spare competition battery (fully charged) - 1x Practice battery (backup) - Battery charger with status indicator - Battery maintenance supplies Main Distribution: - 1x Spare main breaker (120A) - 2x SB50 connector sets (red/black) - 2x Ring terminals (large gauge) - 1x Battery post cleaning kit

Power Distribution Hub (PDH)

Fuses (Minimum Quantities): - 20A: 4 pieces - 30A: 4 pieces - 40A: 2 pieces - Custom ratings: As specified in documentation Connectors: - Anderson Powerpole: 10x Red, 10x Black, 20x Housings - Ring terminals: Various sizes for direct connections - Wire nuts: Assorted sizes for emergency repairs - Electrical tape: Professional grade, multiple colors

Wiring Supplies

Wire (Pre-cut Lengths): - 12 AWG: Red, Black (2ft, 6ft, 10ft lengths) - 14 AWG: Red, Black, various colors (1ft, 3ft, 6ft) - 16 AWG: Multiple colors (1ft, 2ft, 4ft) - 18 AWG: Signal wires, various colors Protection & Insulation: - Heat shrink tubing: Multiple diameters - Wire looms and spiral wrap - Cable ties: Various lengths - Electrical tape: Black, red, blue, yellow

🏁 Competition Day Procedures

Pre-Competition Setup Checklist

Pit Area Organization

Physical Setup (30 Minutes)

Space Allocation: □ Tool storage positioned for easy access □ Work surface cleared and prepared □ Power outlets identified and tested □ Lighting arranged for optimal visibility □ Safety equipment positioned and marked Communication Setup: □ Radio communication tested □ Cell phone contacts verified □ Team communication plan reviewed □ Emergency contact list posted □ Backup communication method available Documentation Organization: □ Circuit diagrams accessible □ Troubleshooting guides available □ Inspection checklists ready □ Spare parts inventory updated □ Match schedule posted prominently

Pit Safety Protocols

Safety Zone Establishment: - Clear walkways maintained at all times - Emergency equipment clearly marked - Fire extinguisher location known by all - First aid kit accessible and stocked - Safety officer assigned and identified Electrical Safety: - All power tools inspected before use - Extension cords and outlets checked - Personal protective equipment available - Battery handling procedures reviewed - Emergency shutoff procedures practiced

Workflow Organization

Work Area Zones: Zone 1: Active repair and diagnostics Zone 2: Parts preparation and organization Zone 3: Documentation and communication Zone 4: Storage and backup equipment Zone 5: Safety and emergency response Traffic Flow: - Entry/exit paths clearly defined - Robot movement routes established - Team member circulation managed - Visitor/official access controlled

⏱️ Match Day Timeline

Competition Day Schedule Template

Critical Timing Checkpoints

T-120 minutes: Pit setup complete, tools organized T-90 minutes: Robot inspection preparation begins T-60 minutes: First complete electrical system check T-30 minutes: Final battery installation and test T-15 minutes: Robot queued, documentation complete T-0 minutes: Match begins, pit crew on standby T+5 minutes: Post-match assessment begins T+15 minutes: Priority repairs identified and started

📋 Documentation and Compliance

Required Documentation Package

Technical Documentation Requirements

Circuit Documentation

Electrical Schematic: - Complete system diagram - Component specifications - Wire gauge and color coding - Fuse and breaker ratings - Connector types and pinouts Wiring Diagrams: - Physical wire routing - Connection details - Termination specifications - Testing procedures - Troubleshooting guides

Component Specifications

Bill of Materials: - All electrical components listed - Part numbers and manufacturers - Quantities and specifications - Vendor information - Cost tracking for budgeting Device Configuration: - Motor controller settings - CAN device IDs - Network configurations - Sensor calibrations - Software parameters

Test and Validation Records

System Testing: - Functional test procedures - Performance measurements - Safety system verification - Compliance check results - Acceptance criteria and results Quality Assurance: - Inspection checklists completed - Verification signatures - Test equipment calibration - Documentation review approvals - Change control records
💡

Documentation Best Practice: All documentation should be maintained in both digital and physical formats, with key documents laminated for pit use and backup copies stored safely.

⚠️

Compliance Reminder: Competition rules and requirements can change. Always verify current requirements with official sources and update documentation accordingly.

🎯

Efficiency Tip: Use standardized templates and checklists to ensure consistency and completeness while reducing preparation time and potential oversights.